1865 Queen St E, The Beach, TorontoOpen 24 hours, 7 days(647) 956-6043
Electrician SelectToronto · The Beach(647) 956-6043

Electrician Select Toronto · Queen St E

Electrical panel upgrades for The Beach and the east end

Replacing fuse boxes, 60 and 100 amp panels, and panels with no room left for another circuit. We size the upgrade around how your house uses power now, and around the renovation, EV or heat pump you have coming.

Why east-end homes outgrow their panels

A lot of the housing between Kew Beach and Woodbine Heights went up between the 1910s and the 1950s, when a house ran a few lights, a fridge and a radio. Plenty of those homes still have 60 amp service, or a 100 amp panel that has been added onto for decades. Then come central air, a renovated kitchen with an induction range, a basement suite, a heat pump or an electric car, and the panel runs out of room long before the house does.

Common signs it’s time to look at the panel:

  • Fuses, or a breaker panel with no open spaces and tandem breakers squeezed in to make room
  • The main or individual breakers tripping when several appliances run at once
  • Your insurer asking about panel size, fuses or the age of the wiring
  • Scorch marks, buzzing, or a panel cover that feels warm
  • A planned addition, EV charger, heat pump or basement unit

Service upgrade or panel replacement?

These are two different jobs. A panel replacement swaps the box and breakers but keeps the same incoming service. A service upgrade, usually from 60 or 100 amps to 200, also changes the service entrance and meter base, and the disconnect and reconnect have to be coordinated with Toronto Hydro. Which one you need comes down to a load calculation: we add up what the house draws today and what you plan to add, then size the service to match instead of guessing.

Panel and service work in Ontario needs an Electrical Safety Authority (ESA) permit and inspection. We explain what that involves for your house, and how it affects the schedule, before anything is booked.

Working in older east-end houses

Panels in Beach semis and Danforth-area detached houses often sit in tight basement corners, behind finished walls or against the original foundation, and some still feed knob-and-tube circuits upstairs. When we replace a panel we identify every circuit, deal with undersized or damaged conductors at the panel, add arc-fault and ground-fault protection where the code calls for it, and leave a typed, accurate directory. The next time a breaker trips, you know exactly which room it is.

How a panel upgrade goes

  1. Call or text. Send the address, the panel size if you know it, and a photo of the panel with the door open. That is usually enough to tell what kind of job it is.
  2. Site visit and load calculation. We look at the panel, the service entrance and what is on each circuit, then recommend the size that fits your plans.
  3. Permit and scheduling. If the service size changes, the Toronto Hydro disconnect and reconnect sets the date. The panel swap itself is usually a one-day job with the power off for part of it.
  4. Install, label, inspect. New panel and breakers in, every circuit tested and labelled, and the work inspected before the job is closed out.

Panel upgrade questions

How long will my power be off?

For a straight panel replacement, usually part of one working day. For a service upgrade it depends on when Toronto Hydro can disconnect and reconnect, and we schedule around that so the outage lands on a planned day.

Do I need 200 amps?

Not always. A smaller house without electric heat or an EV may be fine at 100 amps with a new panel. The load calculation answers it, and we will tell you if a bigger service is not worth paying for.

My insurer wants my fuse panel replaced. Can you help?

Yes. Fuse panel replacement is one of the most common calls we get from older east-end homes. We will also check for knob-and-tube on the same circuits, since insurers often ask about both.

Can you upgrade the panel and install an EV charger together?

Yes, and it usually makes sense to plan them together so the charger circuit is designed into the new panel from the start instead of added later.