1865 Queen St E, The Beach, TorontoOpen 24 hours, 7 days(647) 956-6043
Electrician SelectToronto · The Beach(647) 956-6043

Electrician Select Toronto · Queen St E

Level 2 EV charger installation in Toronto’s east end

Home charging for Teslas, Ioniqs, Mustang Mach-Es, F-150 Lightnings and everything else, on a properly sized 240 volt circuit. We check what your panel can handle first, so the charger runs at full speed without tripping the main.

What a Level 2 install involves

A Level 2 charger runs on a dedicated 240 volt circuit, usually 40 to 60 amps depending on the charger and the car. That is the same kind of load as an electric range, and on an older east-end panel it is the part that needs planning. Every install starts with a load calculation for the house: what is already on the panel, what runs at the same time in winter and summer, and how much room is left.

From there it is usually one of three paths:

  • Enough capacity: a new breaker and a dedicated run to the charger location.
  • Tight capacity: an EV energy management system that pauses or slows charging when the rest of the house is drawing heavily, or a lower-amp circuit that still fills the battery overnight.
  • Not enough capacity: a panel or service upgrade, planned together with the charger.

Garages, front pads and laneways

Parking around The Beach and Upper Beaches takes every form: detached garages off a laneway, front pads, mutual drives and tight side lots. Where the charger goes decides most of the work. A spot near the panel is a short run. A detached garage can mean running cable overhead or underground, sometimes to a small sub-panel, and an outdoor wall or post mount needs equipment rated for Toronto winters. We walk the route with you and explain the options before you buy anything.

Choosing the charger

We install the major brands, including Tesla Wall Connector, ChargePoint, Grizzl-E, FLO and Emporia. Hardwired chargers are generally the better choice for daily use: fewer connection points to wear out and access to higher charging speeds. If you have not bought one yet, tell us the car and where you park, and we will suggest what fits your panel. If a second EV is likely down the road, it is worth planning the capacity for it now.

EV charger circuits in Ontario need an ESA permit and inspection, and we will explain how that fits into the schedule.

From first text to first charge

  1. Send us the details. The car, the charger if you have one, a photo of your panel and a photo of where you park.
  2. Load calculation. We check panel capacity and decide between a straight circuit, load management or an upgrade.
  3. Install. Breaker, cable run and charger mounted and connected. Most straightforward installs take a single visit.
  4. Test and set up. We confirm the charger’s amperage setting matches the circuit, and test it with your car where possible.

EV charger questions

Can my 100 amp panel handle an EV charger?

Often, yes, especially with load management or a 32 to 40 amp charging setup. It depends on what else the house runs, which is why we do the load calculation before recommending anything.

How fast does a Level 2 charger charge?

It depends on the car and the circuit, but most EVs add roughly 30 to 60 km of range per hour on Level 2. For most daily driving, that is a full battery by morning.

Can you install a charger in a detached garage?

Yes. It usually means a longer cable run from the house, overhead or underground, and sometimes a small sub-panel in the garage. We lay out the route after seeing it.

Should I use a plug-in charger on a NEMA 14-50 outlet instead?

You can, but hardwiring is usually the better option for daily charging. An outlet used for EV charging carries a heavy, long load every night, and lower-quality receptacles can overheat. We will explain the trade-offs for your setup.