What we find in Beach houses
Many Beach homes started as summer cottages or modest early-1900s houses and were expanded over decades. The wiring often reflects that: original runs in the oldest part, newer cable in additions, and connections between them hidden in attics and basements.
Rewire options
- Whole-house rewire. New grounded circuits throughout, usually with a new panel and arc-fault breakers where the code calls for them.
- Partial rewire. The oldest part of the house, or the rooms an inspection flagged.
- Renovation rewire. When walls are open for a kitchen or bathroom, replacing the wiring costs a fraction of doing it later.
- Basement subpanel. For a finished basement or suite, a subpanel keeps the new circuits organised.
Keeping the house intact
We fish cable from the basement and attic through existing cavities and keep wall openings small. Porches and sunrooms that were added later often need their own route, and we plan those first.
The steps
- Survey. What is live, where it runs, and what the panel can take.
- Scope in writing. Rooms, circuits and patching.
- Permit and rewire. Filed with the Electrical Safety Authority, then installed.
- Inspection. ESA inspects and you get a labelled panel.